gate


point at which the construction product (3.2.2) or material (ISO 6707-1:2004, 6.1.1) leaves the factory before it becomes an input into a subsequent manufacturing process (ISO 21931-1:2010, 3.11) or before it is transported to a distributor, another factory or a construction site (3.2.10)